Easily Manage Change Orders and Owner Billings

Create and approve change orders easily for faster subcontractor management. Quickly create and submit owner billings as needed.

Why are better change order processes needed?

In a recent GCPay market study, over 50% of general contractors expected to see more change orders created this year compared to last. So having an established change order process is more necessary now than ever.

If your change order process originates within your accounting ERP, GCPay integrations allow you to maintain your current change order process and sync information for transparency and visibility between systems.

 

Explore billing and payment controls

However, if you need GCPay to manage the origination of change orders with subcontractors, we have this option customizable even further. 

You can create constrained or unconstrained change orders within GCPay, creating even more flexibility to meet your custom needs.

01 An unconstrained change order acts like a traditional CO that would be submitted and proceeds through the approval process predetermined by the user. This standard change order submission method is often preferred by users within GCPay.

02 A constrained change order is issued by the general contractor with a set value that requires the subcontractor to breakout each line, as well as the specified amounts. This CO will need to be detailed by a subcontractor and then approved by the GC before it can be billed against.

“Subcontractors can’t sneak in a change order that has not been approved. Their SOV must match their contract value. It makes the sub accountable.”
Payment Application GCPay Customer Quote
Suzanne Randall
Accounting Team, Downes Construction

Make Owner Billings Simple and Easy

Owner billings are a cornerstone of construction project management, serving as the primary mechanism for moving funds from the project owner to the contractor as work is completed. Their importance lies in balancing financial risk and ensuring the project has the necessary liquidity to reach completion.

GCPay allows users to create official AIA G702/703 owner billings, or G702/703 style owner billings, automatically incorporating the costs approved for your subcontractors. This eliminates the time-consuming process of manually calculating the costs for projects, and reporting to owners on an “as-needed” basis. All associated documents are housed in one easy-to-access location, which can be pulled in an owner billing report.

The Owner billing feature, enables users to enter an Owner/Developer as a GCPay company without them ever having access to GCPay. Owner Pay Applications will look and feel exactly like subcontractor pay applications. The format will be the Standard AIA G702/703 and will require an approval process.

GCPay allows each user to package what is required by owners on each pay application, so owner billings can be easily managed in a much faster way.

Read the Owner Billing Guide

Bring your change orders and billings together

See how GCPay connects approved changes, subcontractor pay applications, and owner billing preparation for your projects.

FAQs

After the required approval process is complete. For a constrained change order, your subcontractor first breaks the set value into the required line items and amounts for your review.

You can prepare billings through your GC workflow, or use a setup where the owner handles submissions and approvals in GCPay. Choose the approach that matches your owner’s participation.

No. Owner billing information does not push to or pull from your ERP. Prepare the billing and draw package in GCPay, then continue to book receivables in your ERP.

Contact GCPay Support or your Account Manager. Confirm the subcontractor-to-owner SOV mapping, approval responsibilities, and supporting documents needed for each draw.